Compensation of 110 kV Cable Lines – Possibilities and Limitations

Main Article Content

Piotr Kacejko, Paweł Pijarski, Sylwester Adamek

Abstract

This paper discusses problems of the compensation of 110 kV cable lines tens of kilometres long. Such lines are currently built primarily to connect a wind farm, as a consequence of the difficulties in obtaining permits for overhead line construction. Practical design problems derive from the fact of an undetermined cable capacitance and choke reactance (individually manufactured custom devices) and the voltage variation at the interconnection point. With a probabilistic approach possible solutions are suggested for selecting compensation devices.

Article Details

How to Cite
Piotr Kacejko, Paweł Pijarski, Sylwester Adamek. (2015). Compensation of 110 kV Cable Lines – Possibilities and Limitations. Acta Energetica, (03), 26–38. https://doi.org/10.52710/ae.437
Section
Articles

References

Saadat H., Power System Analysis,

McGraw-Hill International Editions,

-rd edition, 2010.

Sobral A., Moura A., Carvalho M.,

Technical Implementation of Cross

Bonding in Underground HV Lines

Projects, 21-st International Conference

on Electricity Distribution, Frankfurt

–9 czerwca 2011, paper 0499.

Iwanicki M., Dębek M., Kompensacja

mocy biernej indukcyjnej oraz pojemnościowej

na farmach wiatrowych,

Wiadomości Elektrotechniczne 2015, nr 2,

s. 35–38.

Instrukcja Ruchu i Eksploatacji Sieci

Przesyłowej PSE SA [online], http://www.

pse.pl/.

Lubośny Z., Farmy wiatrowe w systemie

elektroenergetycznym, Warszawa, WNT

Kacejko P., Pijarski P., Generation level

matching to the transmission capability

of overhead lines, Acta Energetica 2013,

nr 1/14, s. 43–49.

Kacejko P., Pijarski P., Przyłączanie farm

wiatrowych – ograniczenia zamiast

przewymiarowanych

inwestycji, Rynek

Energii 2009, nr 1 (80), s. 10–15.