Compensation of 110 kV Cable Lines – Possibilities and Limitations
Main Article Content
Abstract
This paper discusses problems of the compensation of 110 kV cable lines tens of kilometres long. Such lines are currently built primarily to connect a wind farm, as a consequence of the difficulties in obtaining permits for overhead line construction. Practical design problems derive from the fact of an undetermined cable capacitance and choke reactance (individually manufactured custom devices) and the voltage variation at the interconnection point. With a probabilistic approach possible solutions are suggested for selecting compensation devices.
Article Details
References
Saadat H., Power System Analysis,
McGraw-Hill International Editions,
-rd edition, 2010.
Sobral A., Moura A., Carvalho M.,
Technical Implementation of Cross
Bonding in Underground HV Lines
Projects, 21-st International Conference
on Electricity Distribution, Frankfurt
–9 czerwca 2011, paper 0499.
Iwanicki M., Dębek M., Kompensacja
mocy biernej indukcyjnej oraz pojemnościowej
na farmach wiatrowych,
Wiadomości Elektrotechniczne 2015, nr 2,
s. 35–38.
Instrukcja Ruchu i Eksploatacji Sieci
Przesyłowej PSE SA [online], http://www.
pse.pl/.
Lubośny Z., Farmy wiatrowe w systemie
elektroenergetycznym, Warszawa, WNT
Kacejko P., Pijarski P., Generation level
matching to the transmission capability
of overhead lines, Acta Energetica 2013,
nr 1/14, s. 43–49.
Kacejko P., Pijarski P., Przyłączanie farm
wiatrowych – ograniczenia zamiast
przewymiarowanych
inwestycji, Rynek
Energii 2009, nr 1 (80), s. 10–15.