Problems of Connecting Wind Farms to the Power System with HV Cables

Main Article Content

Jacek Klucznik

Abstract

This paper presents problems caused by connecting wind farms to a power system with high voltage cables. The author highlights possible problems with reactive power compensation, depending on the arrangement of the shunt reactor connection and settings of control systems for reactive power and voltage of the wind farm. The paper also discusses issues of increasing active power losses caused by a shunt reactor installation.

Article Details

How to Cite
Jacek Klucznik. (2016). Problems of Connecting Wind Farms to the Power System with HV Cables. Acta Energetica, (02), 118–126. https://doi.org/10.52710/ae.380
Section
Articles

References

Lubośny Z., Farmy wiatrowe w systemie

elektroenergetycznym, WNT 2009.

Taryfa Energa-Operator SA, zatwierdzona

Decyzją Prezesa URE nr DRE-4211-

(8)/2013/VII/WDR/KGo z dnia

12.2013.

Instrukcja Ruchu i Eksploatacji Sieci

Przesyłowej PSE-Operator z 1 sierpnia

Dry-Type, Air-Core Shunt Reactors,

Trench Austria GmbH.