Start-up of a power unit of a thermal power plant auxiliary system with supply from a hydropower plant

Main Article Content

Z. Lubośny, K. Dobrzyński, J. Klucznik

Abstract


This article discusses the issues related to a power unit of a thermal power plant start-up with the use of a hydropower plant. Hydropower plant can supply and will enable start-up of auxiliary equipment in a power unit of a thermal power plant. Due to high capacity of auxiliary drives, start-up of auxiliaries in a thermal power plant after blackout (and boiler shutdown) is not possible from emergency energy sources in the power plant. In such a case an external electricity source with high capacity is required.


Article Details

How to Cite
Z. Lubośny, K. Dobrzyński, J. Klucznik. (2022). Start-up of a power unit of a thermal power plant auxiliary system with supply from a hydropower plant. Acta Energetica, (03), 60–69. https://doi.org/10.52710/ae.349
Section
Articles

References

Bajorek Z., Teoria maszyn elektrycznych [Theory of electric machines], Warsaw 1982.

Study of operation of Włocławek Hydropower Plant on a separate grid. Report of the experiment on start-up of a 200 MW power unit no. 6 in Pątnów Power Plant with auxiliary supply from Włocławek Hydropower Plant of 20/06/1998, Institute of Power Engineering Gdańsk Division, Control Department, Warsaw 1998.

Study of rotational speed and voltage control system for hydroelectric sets in Włocławek Hydropower Plant in order to determine their technical condition, scope of upgrading and capability of operation on the separate grid in the case of blackout in the KSE (NPS), Institute of Power Engineering Gdańsk Division, Department of Electrohydraulic Equipment, Warsaw 1998.

Kundur P., Power System Stability and Control, McGraw-Hill, Inc., New York 1993.

Laudyn D., Pawlik M., Strzelczyk F., Elektrownie [Power plants], Warsaw 1995.

Pawlik M., Skierski J., Układy i urządzenia potrzeb własnych elektrowni [Auxiliary systems and equipment in power plants], Warsaw 1986.

Szczerba Z., Lubośny Z., Zajczyk R., Modelowanie rozruchów urządzeń potrzeb własnych bloków elektrowni cieplnych przy zasilaniu z odległych elektrowni wodnych w programie PSLF [Modelling of start-up of auxiliary equipment of power units in thermal power plants with supply from distant hydropower plants in the PSLF program]. Stage II. Analiza rozruchu układu potrzeb własnych i toru przesyłowego elektrownia wodna Włocławek – elektrownia Pątnów [Analysis of start-up of the auxiliary system and Włocławek Hydropower Plant – Pątnów Power Plant transmission line], Unipol s.c., March 2000.

Skierski J., Nieliniowy model matematyczny silnika asynchronicznego do analizy stanów przejściowych w trakcie wybiegu grupowego [Non-linear mathematical model of asynchronous motor for analysis of transients during group operation], Przegląd Elektrotechniczny 1978, R LIV, z. 2.

Śliwiński T., Głowacki A., Parametry rozruchowe silników indukcyjnych [Start-up parameters of induction motors], Warsaw 1982.

Janiczek R., Eksploatacja elektrowni cieplnych [Operation of thermal power stations], Warsaw 1980.