Dedicated Work Opportunities of Municipal CHP Blocks in a Catastrophic Failure of the Power System State

Main Article Content

I. Grządzielski, K. Sroka, J. Pic, A. Łacny

Abstract


Under conditions of a catastrophic system failure developing, in the Polish Power System (PPS), the creation of island systems powered by municipal CHP generating units may be one way to maintain the units’ production capacity. Block island load system BC 50 could create own and general EC Karolin and industrial plants located in the immediate vicinity of the thermal-electric power station receipts.


Article Details

How to Cite
I. Grządzielski, K. Sroka, J. Pic, A. Łacny. (2013). Dedicated Work Opportunities of Municipal CHP Blocks in a Catastrophic Failure of the Power System State. Acta Energetica, (01), 32–42. https://doi.org/10.52710/ae.321
Section
Articles

References

Rychlak J., Kuczyński R., Regulacyjne Usługi Systemowe – środki techniczne obrony i odbudowy KSE, II Konferencja Naukowo-Techniczna „Blackout a Krajowy System Elektroenergetyczny”, Poznań, kwiecień 2007, Energetyka – zeszyt tematyczny 2007, nr X.

Dudzik J., Kuczyński R., Strategia obrony i odbudowy Krajowego Systemu Elektroenergetycznego, rola wytwórców w planach odbudowy, III Konferencja Naukowo-Techniczna „Black-out a Krajowy System Elektroenergetyczny”, Poznań, październik 2008, Energetyka – zeszyt tematyczny 2008, nr XVII.

Instrukcja ruchu i eksploatacji sieci przesyłowej. Warunki korzystania, prowadzenia ruchu, eksploatacji i planowania rozwoju sieci. Wersja 2.0, tekst jednolity obowiązujący od 1 stycznia 2012.

Pasiut G., Rychlik J., Kielak R., Weryfikacja zdolności jednostek wytwórczych do udziału w procesie obrony i odbudowy zasilania KSE, w świetle zapisów IRiESP, Energetyka – zeszyt tematyczny 2010, nr XX.