The Implementation of Smart Metering System in ENERGA-OPERATOR SA – From Idea to Production

Main Article Content

R. Masiąg

Abstract







This article presents a summary of the project implementation of Smart Metering systems in ENERGA-OPERATOR SA. The main objective of the project is the remote management and remote measurement data acquisition, reduction of the carrying difference, increasing energy efficiency and efficient management of the grid distribution and control consumption energy by the consumer and many others. This paper describes the business and technical assumption, challenges of the implementation of the project, the results achieved, and the reasons for the decision on the project by the company.












 



Article Details

How to Cite
R. Masiąg. (2014). The Implementation of Smart Metering System in ENERGA-OPERATOR SA – From Idea to Production. Acta Energetica, (02), 113–126. https://doi.org/10.52710/ae.286
Section
Articles

References

ENERGA-OPERATOR SA, Podsumowanie wdrożenia Etapu I projektu AMI wg stanu na dzień 31 grudnia 2012 [The Summary of implementation of the 1st Stage of AMI Project as of 31 December 2012], Gdańsk, January 2013.

Urząd Regulacji Energetyki, Stanowisko prezesa URE w sprawie niezbędnych wymagań wobec wdrażanych przez OSD E inteligentnych systemów pomiarowo-rozliczeniowych z uwzględnieniem funkcji celu oraz proponowanych mechanizmów wsparcia przy postulowanym modelu rynku [Energy Regulatory Authority, The Position of the President of URE on the necessary requirements for the smart metering systems implemented by OSD E, taking into account the purpose and the proposed support mechanisms for the postulated market model] Warsaw, May 2011.

Urząd Regulacji Energetyki, Raport Krajowy Prezesa Urzędu Regulacji Energetyki 2011 [Energy Regulatory Authority, The National Report of the President of the Energy Regulatory Authority], July 2011.