New Structure of Governor Electrohydraulic Power which meets the Requirements of the Implemented LFC-System

Main Article Content

M. Pawlak, J. Karczewski

Abstract







The construction and operation of a control system of a power unit turboset has been described. The controllers use the CWP (Current Work Point) signal from the ACFP (Automatic Control Frequency and Power) system. Such an installation has been made on a power unit in a Power Plant. The control system functions, principle of operation, structure, software and investigation results have been presented. The new LFC (Load Frequency Control) system has been described in this paper. The benefits for the energy-producer are mentioned. Increasing complexity of the control systems of steam turbines has called for the development of diagnostic methods and measures.












 



Article Details

How to Cite
M. Pawlak, J. Karczewski. (2014). New Structure of Governor Electrohydraulic Power which meets the Requirements of the Implemented LFC-System. Acta Energetica, (01), 126–141. https://doi.org/10.52710/ae.272
Section
Articles

References

Machowski J., Regulacja i stabilność systemu elektroenergetycznego [Power system control and stability], Warszawa 2007, p. 382

Pawlik M., Strzelczyk F., Elektrownie [Power plants], Warszawa, 2009, p. 634.

Karczewski J. et al., Assessment of availability of the power unit participating in the regulation of electrical power system, Archiwum Energetyki 2010, Vol. XL, No. 1, pp. 89–103.

Wymogi wobec JWCD na potrzeby wdrażania systemu LFC PSE-Operator [Requirements for JWCD in view of the LFC PSE – Operator system implementation], version 2 Konstancin-Jeziorna, 4 August 2011.

Karczewski J. et. al., Raport z badań przeprowadzonych 1 czerwca 2012 na bloku nr 1 w EL. Adamów [Report of the tests performed on 1 June 2012 on unit 1 at Adamów power plant] ITC 2012.