1.
B. Czarnecki. The idea of increasing the NPS operational flexibility by reallocating the secondary reserve band to wind power plants. AE [Internet]. 2017 Sep. 30 [cited 2024 May 3];(03):49-53. Available from: https://www.actaenergetica.org/index.php/journal/article/view/189