Mariusz Kłos, Łukasz Rosłaniec, Józef Paska, Karol Pawlak. 2016. “The Main Problem of the Development of Offshore Wind Farms Is Their Integration With the Existing Power Infrastructure. Electricity Can Be Transmitted over HVAC and HVDC Cable Lines. Because of Its Many Advantages, HVDC Technology Seems the Target Solutio”. Acta Energetica, no. 02 (June):127-38. https://doi.org/10.52710/ae.381.