[1]
Andrzej Wędzik 2015. Integrated Method for Optimizing Connection Layout and Cable Selection for an Internal Network of a Wind Farm. Acta Energetica. 03 (Sep. 2015), 142–152. DOI:https://doi.org/10.52710/ae.447.